Lead times vary from 3 days to 3 weeks depending on weather and demand. On smallish jobs, say 10 meters, the fencer may bring the materials with him to site and on larger jobs the materials are delivered by the supplier to site.
If you have an existing fence, the installer will remove it from the ground. This can be done in 1 to 4 hours depending on the construction material and length of the fence.
Your installer then begins construction. For timber fences – the posts go in and are set in a concrete mix for strength. Then the rails are fixed to the posts with screws or nails. The palings come next to finish off the fence.
Colorbond fences are erected in sections with sheets and capping for strength and durability. Please call us during business hours to have a chat about your fencing needs.